NOUVEAUTÉS

JALTEST CASE STUDY: Calibration of the Volvo I-Shift gearbox not installed in the vehicle

10 juin 2020

In this new #JaltestCaseStudy, we show you how to carry out the diagnostics, calibration, and repair with Jaltest of an I-Shift gearbox outside the vehicle, after having replaced its internal components. This calibration allows the control unit to set and record the values of the splitter and range shift cylinders which are responsible for gearing the different speeds of the gearbox.

The main advantage of performing this operation before installing the gearbox on the vehicle is the time saved if a fault is detected during the calibration process.

Besides, there are specialized customers in the repair of this type of system, who are supplied with gearboxes without the need to have the vehicle in the workshop itself.

Once again, Jaltest provides the workshop with the necessary tools to carry out the diagnostics process as quickly and efficiently as possible.

PLUS DE NOUVEAUTÉS

R.H. Sheppard Co. présente le premier outil de diagnostic créé pour ses propres systèmes : Sheppard Diagnostic Tool (SDT)

R.H. SHEPPARD CO. PRÉSENTE LE PREMIER OUTIL DE DIAGNOSTIC CRÉÉ POUR SES PROPRES SYSTÈMES : SHEPPARD DIAGNOSTIC TOOL (SDT)

2 juil. 2025

R.H. Sheppard Co., entreprise de renom spécialisée ...

Lire davantage
Jaltest Case Study | Vérification des sondes à oxygène sur le moteur Volvo Penta V6-280

JALTEST CASE STUDY | VÉRIFICATION DES SONDES À OXYGÈNE SUR LE MOTEUR VOLVO PENTA V6-280

2 juil. 2025

Savez-vous comment est réalisé la vérification des ...

Lire davantage
Book a Demo
Anchor Bottom